MODIFICATIONS OF GKN Aerospace Transparency Systems Inc. (19)

INSTALLATION OF ASTEC MANUFACTURING INLET ASSEMBLY PER ASTECH MANUFACTURING, INC

Installation of ASTEC Manufacturing inlet assembly per ASTECH Manufacturing, Inc. Document no. MDL-030-06009 titled Master Drawing List - MD-80 Series Inlet, Revision A00, dtd 6/20/01 or later FAA approved revision. GKN Aerospace is responsible for the complete design, development, manufacture, assembly and certification of Inlets for turbofan and turboprop applications
View details

INSTALLATION OF ASTECH ENGINEERED PRODUCTS, INC. INLET INNER BARREL ASSEMBLY

Installation of ASTECH Engineered Products, Inc. Inlet Inner Barrel Assembly in accordance with ASTECH Engineered Products, Inc. document titled, 'Master Drawing List A320 CFM56-5A Series Engine Inlet Drawing List No. MDL030-11030', Revision NC, dated December 11, 2003, or later FAA Approved revisions.   GKN Aerospace is responsible for the complete design, development, manufacture, assembly and certification of Inlets for turbofan and turboprop applications.
View details

INSTALLATION OF ASTECH ENGINEERED PRODUCTS FAN COWL DOOR.

Installation of ASTECH Engineered Products fan cowl door. GKN Aerospace is responsible for the complete design, development, manufacture, assembly and certification of a number of fan cowl doors on both turboprop and turbofan aircraft . We are able to provide flexible design solutions for fan cowl doors, incorporating a number of materials required dependant on the conditions that it is exposed to, ranging from complex composite ...
View details

MODIFICATION TO PROVIDE A REPLACEMENT FAIRING ASSEMBLY FOR MCDONNELL DOUGLAS...

Modification to provide a replacement Fairing Assembly for McDonnell Douglas P/N 5959171.
View details

INSTALLATION OF AN ACOUSTIC FAN REVERSER TRANSLATING SLEEVE PANEL.

Installation of an acoustic fan reverser translating sleeve panel.
View details

INSTALLATION OF A BOEING 777 COCKPIT WINDSHIELD

Installation of a GKN Aerospace designed Boeing 777 No 1 Windshield PartNo. 10702 (LH) / 10703 (RH); or Part No. 10712 (LH) / 10713 (RH) Limitations: None. Conditions: Replacement of a Flight Compartment Window Number 1 per this STC withGKN ATS part no. 10712 (LH) / 10713 (RH) together with the relevantwiring loom modification constitutes an Alternative Method of Compliance(AMOC) to the terminating action requirements of
View details

INSTALLATION OF ASTECH INLET INNER BARREL ASSEMBLY

Installation of ASTECH Engineered Products, Inc. Inlet Inner Barrel Assembly in accordance with Master Drawing List, A320/CFM56- 5ASeries Engine Inlet, Drawing List Number MDL030-11030 Revision C. GKN Aerospace is responsible for the complete design, development, manufacture, assembly and certification of Inlets for turbofan and turboprop applications.
View details

INSTALLATION OF ASTECH ENGINEERED PRODUCTS FAN COWL DOOR

Installation of ASTECH Engineered Products fan cowl door in accordance with ASTECH’s Master Drawing List V2500 Cowl Door Assembly No. MDL030-16103, Revision “A”.
View details

INSTALLATION OF ASTECH ENGINEERED PRODUCTS, INC. INLET ASSEMBLY.

Installation of ASTECH Engineered Products, Inc. inlet assembly. GKN Aerospace is responsible for the complete design, development, manufacture, assembly and certification of Inlets for turbofan and turboprop applications.  
View details

NUMBER 2 COCKPIT WINDSHIELDS ADDITION OF LAYERS

Number 2 Cockpit Windshields Addition of Layers of Polyrethane Interlayer to the Existing Qualified Design to improve In-Service Reliability. Limitations: This approval provides for the installation of the referenced windows individually or in any combination.. Conditions: n/a
View details

INTRODUCTION OF COCKPIT WINDOWS WITH IMPROVED DESIGN FOR BOEING 747...

Introduction of cockpit windows with improved design for Boeing 747 series aircraft. GKN p/n 06314 and 06315 as replacement for Boeing p/n 65B27042 and 65B27046 and GKN p/n 06316 and 06317 as replacement for Boeing p/n 065B27043 and 65B27047. Limitations: This approval provides for the installation of the referenced windows indivdually or in any combination.. Conditions: n/a
View details

NUMBER 1 COCKPIT WINDSHIELDS

Number 1 Cockpit Windshields. Addition of layers of polyurethane interlayer to the existing qualified designs to improve in-servicereliability Limitations: This approval provides for the installation of the referenced windows individually or in any combination.. Conditions: n/a
View details

INSTALLATION OF ASTECH MANUFACTURING, INC. INLET ASSEMBLY

Installation of ASTECH Manufacturing, Inc. inlet assembly GKN Aerospace is responsible for the complete design, development, manufacture, assembly and certification of Inlets for turbofan and turboprop applications.  
View details

INSTALLATION OF CFM56-5B ENGINE INLET INNER LOWER BARREL PANEL ASSEMBLY.

Installation of CFM56-5B Engine Inlet Inner Lower Barrel Panel Assembly.
View details

INSTALLATION OF ACT, INC. HIGH STRENGTH SELF-SEALING FUEL CELLS.

Installation of ACT, Inc. high strength self-sealing fuel cells.
View details