Overview

STC Number
:
Contact Details
:

Introduction

Installation of main deck cargo loading system


Airbus A300
€ RFQ

Product Description

Installation of main deck cargo loading system

Please contact modification supplier for further details.

STC Status: Issued
STC Date: 04/11/13
Responsible Office: Los Angeles Aircraft Certification Office (ANM-100L), Tel: (562) 627-5200

Airbus

  • A300 B4-605R
  • A300 B4-622R