Installation of Mid-Cabin Door Installation per Drawing List Report F9EX-01043 latest FAA approved revision. Limited to airplanes operating under FAR Part 91.
Installation of bracket installations per Drawing List Report No. F90-01093 latest FAA approved revision.
Installation of HF Radio Master System per Drawing List Report No. F9EX-01044 latest FAA approved revision.
Installation of cabin master switch system per Drawing List Report No. F9EX-01041 latest FAA approved revision.
Installation of cabin master switch system.