Overview

STC Number
:
STC Report
:
Contact Details
:

Introduction

Thanks to progressive implementation of PBN onboard capabilities and flight routes, most part of the current conventional navigation infrastructure will be decommissioned in order to reduce cost and improve network capability. This will require compliance with PBN requirements in order to use certain flight routes.


Your needs

Most regulations require aircraft to be suitably equipped in order to operate some routes and approach procedures. This includes not only installed RNP equipment but also design and operational approvals, Flight Manual Supplements and flight crew training.

In particular RNAV/RNP 1 approval is becoming almost indispensable since many airports in Europe are requiring it in order to fly SIDs and STARs. Therefore for maintaining aircraft operational capabilities, existing FMS should be upgraded.


Your benefits

  • Easy compliance with RNAV 1 and RNP 1 for aircraft equipped with GNS-XL(S).

  • Minimal installation impact, direct replacement. No wiring or mechanical changes.

  • Improved flight safety and reduced workload.

  • Flight time, fuel consumption and environmental impact reduction.

  • Extend operational life and maintain aircraft value by making it compliant with latest mandates and airworthy for most countries.

  • Optional customization for specific needs with our expert engineering team.

  • Improved capacity and safety of airspace.


Textron Cessna Citation Encore, V, 560, 560XL
€ RFQ
Textron Cessna Citation Excel, XLS, 560XL
€ RFQ
Textron Cessna Citation I, 500, 501
€ RFQ
Textron Cessna Citation II, Bravo, S550, 551
€ RFQ

Product Description

Sirium Aerotech offers an approved turnkey solution for your Cessna citation with a minimal installation time and cost. Our STC will upgrade by direct replacement the existing GNS-XL(S) FMS to a new version and provide approval for RNAV/RNP 1 .

Modification is available with and without installation kit so that you can get rid of logistics problems or get parts from your local supplier.

All necessary supplements for continued safe operation of the aircraft will be issued including Airplane Flight Manual, Master Minimum Equipment List, Maintenance Manual and Illustrated Parts Catalog.


Your benefits

  • Easy compliance with RNAV 1 and RNP 1 for aircraft equipped with GNS-XL(S).

  • Minimal installation impact, direct replacement. No wiring or mechanical changes.

  • Improved flight safety and reduced workload.

  • Flight time, fuel consumption and environmental impact reduction.

  • Extend operational life and maintain aircraft value by making it compliant with latest mandates and airworthy for most countries.

  • Optional customization for specific needs with our expert engineering team.

  • Improved capacity and safety of airspace.